NEWFOUNDLAND AND LABRADOR
REGULATION 120/09

Offshore Petroleum Drilling and Production Newfoundland
and Labrador Regulations, 2009
under the
Canada-Newfoundland and Labrador Atlantic Accord Implementation Newfoundland and Labrador Act
(O.C. 2009-386)

(Filed December 22, 2009 )

Under the authority of section 145 of the Canada-Newfoundland and Labrador Atlantic Accord Implementation Newfoundland and Labrador Act, the Lieutenant-Governor in Council makes the following regulations.

Dated at St. John's , December 22, 2009 .

Gary Norris
Clerk of the Executive Council

REGULATIONS

Analysis


       
1.   Short title

       
2.   Interpretation

              PART I
BOARD'S POWERS

       
3.   Spacing

       
4.   Names and designations

       
5.   Other powers of the board

              PART II
MANAGEMENT SYSTEM, APPLICATION FOR AUTHORIZATION AND WELL APPROVALS

       
6.   Management system

       
7.   Application for authorization

       
8.   Other requirements- production installation

       
9.   Safety plan

     
10.   Environmental plan

     
11.   Well approval

     
12.   Well approval -drilling

     
13.   Application

     
14.   Well approval

     
15.   Suspension and revocation of approval

     
16.   Development plans

     
17.   Resource management plan

              PART III
OPERATOR'S DUTIES

     
18.   Availability of documents

     
19.   Management system

     
20.   Safety and environmental protection

     
21.   Appropriate use of equipment

     
22.   Smoking prohibited

     
23.   Storing and handling of consumables

     
24.   Handling of chemical substances, waste material and oil

     
25.   Cessation of a work or activity

              PART IV
EQUIPMENT AND OPERATIONS

     
26.   Duties of operator

     
27.   Duties of operator

     
28.   Defect to be remedied

     
29.   Drilling fluid system

     
30.   Marine riser

     
31.   Drilling practices

     
32.   Reference for well depths

     
33.   Directional and deviation surveys

     
34.   Formation of leak-off tests

     
35.   Formation flow and well testing equipment

     
36.   Well control

     
37.   Well control equipment

     
38.   Equipment to be tested

     
39.   Loss of well control

     
40.   Casing and cementing

     
41.   Depth of installation

     
42.   Cement slurry requirements

     
43.   Waiting on cement time

     
44.   Casing pressure testing

     
45.   Production tubing

     
46.   Monitoring and control of process operations

     
47.   Well completion

     
48.   Subsurface safety valve

     
49.   Wellhead and Christmas tree equipment

              PART V
EVALUATION OF WELLS, POOLS AND FIELDS

     
50.   Implementation-acquisition programs

     
51.   Where programs cannot be implemented

     
52.   Testing and sampling of formations

     
53.   Formation flow testing

     
54.   Submission of samples and data

     
55.   Samples removed from core

     
56.   Notification required

              PART VI
WELL TERMINATION

     
57.   Suspension or abandonment

     
58.   Monitoring and inspection

     
59.   Seafloor to be cleared

     
60.   Installation removal

              PART VII
MEASUREMENTS

     
61.   Flow and volume

     
62.   Allocation

     
63.   Testing, maintenance and notification

     
64.   Transfer meters

     
65.   Proration of testing frequency

              PART VIII
PRODUCTION CONSERVATION

     
66.   Resource management

     
67.   Commingled production

     
68.   Gas flaring and venting

     
69.   Oil burning

              PART IX
SUPPORT OPERATIONS

     
70.   Support craft

     
71.   Support craft- manned installations

     
72.   Safety zone

              PART X
TRAINING AND COMPETENCY

     
73.   Training and competency of personnel

     
74.   Impairment and fatigue

              PART XI
SUBMISSIONS, NOTIFICATIONS, RECORDS AND REPORTS

     
75.   Reference to names and designations

     
76.   Surveys

     
77.   Incidents and near-misses

     
78.   Submission of data and analysis

     
79.   Records

     
80.   Meteorological observations

     
81.   Daily production record

     
82.   Management of records

     
83.   Formation of flow test reports

     
84.   Pilot scheme

     
85.   Daily reports

     
86.   Monthly production report

     
87.   Annual production report

     
88.   Environmental reports

     
89.   Annual safety report

     
90.   Well history report

     
91.   Well operations report

     
92.   Other reports

              PART XII
  TRANSITIONAL, REPEALS AND COMING INTO FORCE

     
93.   Transitional

     
94.   Repeal

     
95.   Commencement


Short title

        1. These regulations may be cited as the Offshore Petroleum Drilling and Production Newfoundland and Labrador Regulations, 2009 .

120/09 s1

Back to Top

Interpretation

        2. (1) In these regulations

             (a)  "abandoned", in relation to a well, means a well or part of a well that has been permanently plugged;

             (b)  "Act" means the Canada-Newfoundland and Labrador Atlantic Accord Implementation Newfoundland and Labrador Act;

             (c)  "artificial island" means a humanly constructed island to provide a site for the exploration and drilling, or the production, storage, transportation, distribution, measurement, processing or handling, of petroleum;

             (d)  "authorization" means an authorization issued by the board under paragraph 134(1)(b) of the Act;

             (e)  "barrier" means any fluid, plug or seal that prevents petroleum or any other fluid from flowing unintentionally from a well or from a formation into another formation;

             (f)  "casing liner" means a casing that is suspended from a string of casing previously installed in a well and does not extend to the wellhead;

             (g)  "commingled production" means production of petroleum from more than one pool or zone through a common well-bore or flow line without separate measurement of the production from each pool or zone;

             (h)  "completed", in relation to a well, means a well that is prepared for production or injection operations;

              (i)  "completion interval" means a section within a well that is prepared to permit the

                      (i)  production of fluids from the well,

                     (ii)  observation of the performance of a reservoir, or

                    (iii)  injection of fluids into the well;

              (j)  "conductor casing" means the casing that is installed in a well to facilitate drilling of the hole for the surface casing;

             (k)  "drilling program" means the program for the drilling of one or more wells within a specified area and time using one or more drilling installations and includes any work or activity related to the program;

              (l)  "environmental protection plan" means the environmental protection plan submitted to the board under section 7 ;

           (m)  "flow allocation procedure" means the procedure to

                      (i)  allocate total measured quantities of petroleum and water produced from or injected into a pool or zone back to individual wells in a pool or zone where individual well production or injection is not measured separately, and

                     (ii)  allocate production to fields that are using a common storage or processing facility;

             (n)  "flow calculation procedure" means the procedure to be used to convert raw meter output to a measured quantity of petroleum or water;

             (o)  "flow system" means the flow meters, auxiliary equipment attached to the flow meters, fluid sampling devices, production test equipment, the master meter and meter prover used to measure and record the rate and volumes at which fluids are

                      (i)  produced from or injected into a pool,

                     (ii)  used as a fuel,

                    (iii)  used for artificial lift, or

                    (iv)  flared or transferred from a production installation;

             (p)  "fluid" means gas, liquid or a combination of them;

             (q)  "formation flow test" means an operation

                      (i)  to induce the flow of formation fluids to the surface of a well to procure reservoir fluid samples and determine reservoir flow characteristics, or

                     (ii)  to inject fluids into a formation to evaluate injectivity;  

              (r)  "incident" means

                      (i)  any event that causes

                            (A)  a lost or restricted workday injury,

                            (B)  death,

                            (C)  fire or explosion,

                            (D)  a loss of containment of any fluid from a well,

                            (E)  an imminent threat to the safety of a person, installation or support craft, or

                             (F)  pollution,

                     (ii)  any event that results in a missing person, or

                    (iii)  any event that causes

                            (A)  the impairment of any structure, facility, equipment or system critical to the safety of persons, an installation or support craft, or

                            (B)  the impairment of any structure, facility, equipment or system critical to environmental protection;

             (s)  "lost or restricted workday injury" means an injury that prevents an employee from reporting for work or from effectively performing all the duties connected with the employee's regular work on any day subsequent to the day on which the injury occurred whether or not that subsequent day is a working day for that employee;

              (t)  "minor injury" means an employment injury for which medical treatment or first aid is provided and excludes a lost or restricted workday injury;

             (u)  "multi-pool well" means a well that is completed in more than one pool;

             (v)  "natural environment" means the physical and biological environment;

            (w)  "near-miss" means an event that would likely cause an event set out in subparagraph (r)(i), but does not due to particular circumstances;

             (x)  "operator" means a person that holds an operating licence under paragraph 134(1)(a) of the Act and an authorization;  

             (y)  "physical environmental conditions" means the meteorological, oceanographic and related physical conditions, including ice conditions, that might affect a work or activity that is subject to an authorization;

             (z)  "pollution" means the introduction into the natural environment of any substance or form of energy outside the limits applicable to the activity that is subject to an authorization, including spills;

          (aa)  "production control system" means the system provided to control the operation of, and monitor the status of, equipment for the production of petroleum, and includes the installation and workover control system;

          (bb)  "production project" means an undertaking for the purpose of developing a production site on, or producing petroleum from, a pool or field, and includes any work or activity related to the undertaking;

           (cc)  "proration test" means, with respect to a development well to which a development plan applies, a test conducted to measure the rates at which fluids are produced from the well for allocation purposes;

          (dd)  "recovery" means the recovery of petroleum under reasonably foreseeable economic and operational conditions;

           (ee)  "relief well" means a well drilled to assist in controlling a blow-out in an existing well;

            (ff)  "rig release date" means the date on which a rig last conducted well operations;

           (gg)  "safety plan" means the safety plan submitted to the board under section 7 ;

          (hh)  "seafloor" means the surface of all that portion of land under the sea;

             (ii)  "slick line" means a single steel cable used to run tools in a well;

            (jj)  "support craft" means a vessel, vehicle, aircraft, standby vessel or other craft used to provide transportation for or assistance to persons on the site where a work or activity is conducted;

          (kk)  "surface casing" means the casing that is installed in a well to a sufficient depth, in a competent formation, to establish well control for the continuation of the drilling operations;

             (ll)  "suspended", in relation to a well or part of a well, means a well or part of a well in which drilling or production operations have temporarily ceased;

        (mm)  "termination" means the abandonment, completion or suspension of a well's operations;

          (nn)  "waste material" means any garbage, refuse, sewage or waste well fluids or any other useless material that is generated during drilling, well or production operations, including used or surplus drilling fluid and drill cuttings and produced water;

          (oo)  "well approval" means the approval granted by the board under section 14 ;

          (pp)  "well-bore" means the hole drilled by a bit in order to make a well;

          (qq)  "well control" means the control of the movement of fluids into or from a well;

            (rr)  "well operation" means the operation of drilling, completion, recompletion, intervention, re-entry, workover, suspension or abandonment of a well;

            (ss)  "wire line" means a line that contains a conductor wire and that is used to run survey instruments or other tools in a well;

            (tt)  "workover" means an operation on a completed well that requires removal of the Christmas tree or the tubing; and

          (uu)  "zone" means any stratum or any sequence of strata and includes, for the purposes of the definition "commingled production", section 8 , subsection 62 (2), sections 65 to 67 and 75 , subsection 84 (2) and section 87 , a zone that has been designated as such by the board under section 5 .  

             (2)  In these regulations, "delineation well", "development well" and "exploratory well" have the same meaning as in subsection 115(1) of the Act.

             (3)  In these regulations, "drilling installation", "drilling rig", "drilling unit", "drill site", "installation", "production installation", "production operation", "production site" and "subsea production system" have the same meaning as in subsection 2(1) of the Offshore Petroleum Installations Newfoundland and Labrador Regulations.

             (4)  The following definitions apply for the purpose of paragraph 134(4)(c) of the Act:

             (a)  "production facility" means equipment for the production of petroleum located at a production site, including separation, treating and processing facilities, equipment and facilities used in support of production operations, landing areas, heliports, storage areas or tanks and dependent personnel accommodations, but not including any associated platform, artificial island, subsea production system, drilling equipment or diving system; and

             (b)  "production platform" means a production facility and any associated platform, artificial island, subsea production system, offshore loading system, drilling equipment, facilities related to marine activities and dependent diving system.

             (5)  For the purpose of section 189.2 of the Act, any installation is prescribed as an installation.

120/09 s2

PART I
BOARD'S POWERS

Back to Top

Spacing

        3. The board is authorized to make orders respecting the allocation of areas, including the determination of the size of spacing units and the well production rates for the purpose of drilling for or producing petroleum and to exercise any powers and perform any duties that may be necessary for the management and control of petroleum production.

120/09 s3

Back to Top

Names and designations

        4. The board may give a name, classification or status to any well and may change that name, classification or status.

120/09 s4

Back to Top

Other powers of the board

        5. The board may also

             (a)  designate a zone for the purposes of these regulations;

             (b)  give a name to a pool or field; and

             (c)  define the boundaries of a pool, zone or field for the purpose of identifying it.

120/09 s5

PART II
MANAGEMENT SYSTEM, APPLICATION FOR AUTHORIZATION AND WELL APPROVALS

Back to Top

Management system

        6. (1) The applicant for an authorization shall develop an effective management system that integrates operations and technical systems with the management of financial and human resources to ensure compliance with the Act and these regulations.

             (2)  The management system shall include

             (a)  the policies on which the system is based;

             (b)  the processes for setting goals for the improvement of safety, environmental protection and waste prevention;

             (c)  the processes for identifying hazards and for evaluating and managing the associated risks;

             (d)  the processes for ensuring that personnel are trained and competent to perform their duties;

             (e)  the processes for ensuring and maintaining the integrity of all facilities, structures, installations, support craft and equipment necessary to ensure safety, environmental protection and waste prevention;

             (f)  the processes for the internal reporting and analysis of hazards, minor injuries, incidents and near-misses and for taking corrective actions to prevent their recurrence;

             (g)  the documents describing all management system processes and the processes for making personnel aware of their roles and responsibilities with respect to them;

             (h)  the processes for ensuring that all documents associated with the system are current, valid and have been approved by the appropriate level of authority;

              (i)  the processes for conducting periodic reviews or audits of the system and for taking corrective actions where reviews or audits identify areas of non-conformance with the system and opportunities for improvement;

              (j)  the arrangements for coordinating the management and operations of the proposed work or activity among the owner of the installation, the contractors, the operator and others, as applicable; and

             (k)  the name and position of the person accountable for the establishment and maintenance of the system and of the person responsible for implementing it.

             (3)  The management system documentation shall be controlled and set out in a logical and systematic fashion to allow for ease of understanding and efficient implementation.

             (4)  The management system shall correspond to the size, nature and complexity of the operations and activities, hazards and risks associated with the operations.

120/09 s6

Back to Top

Application for authorization

        7. The application for authorization shall be accompanied by

             (a)  a description of the scope of the proposed activities;

             (b)  an execution plan and schedule for undertaking those activities;

             (c)  a safety plan that meets the requirements of section 9 ;

             (d)  an environmental protection plan that meets the requirements of section 10 ;

             (e)  information on any proposed flaring or venting of gas, including the rationale and the estimated rate, quantity and period of the flaring or venting;

             (f)  information on any proposed burning of oil, including the rationale and the estimated quantity of oil proposed to be burned;

             (g)  in the case of a drilling installation, a description of the drilling and well control equipment;

             (h)  in the case of a production installation, a description of the processing facilities and control system;

              (i)  in the case of a production project, a field data acquisition program that allows sufficient pool pressure measurements, fluid samples, cased hole logs and formation flow tests for a comprehensive assessment of the performance of development wells, pool depletion schemes and the field;

              (j)  contingency plans, including emergency response procedures, to mitigate the effects of any reasonably foreseeable event that might compromise safety or environmental protection, which shall

                      (i)  provide for coordination measures with any relevant municipal, provincial, territorial or federal emergency response plan, and

                     (ii)  in an area where oil is reasonably expected to be encountered, identify the scope and frequency of the field practice exercise of oil spill countermeasures; and

             (k)  a description of the decommissioning and abandonment of the site, including methods for restoration of the site after its abandonment.

120/09 s7

Back to Top

Other requirements- production installation

        8. (1) Where the application for authorization covers a production installation, the applicant shall also submit to the board for its approval the flow system, the flow calculation procedure and the flow allocation procedure that will be used to conduct the measurements referred to in Part VII.

             (2)  The board shall approve the flow system, the flow calculation procedure and the flow allocation procedure where the applicant demonstrates that the system and procedures facilitate reasonably accurate measurements and allocate, on a pool or zone basis, the production from and injection into individual wells.

120/09 s8

Back to Top

Safety plan

        9. The safety plan shall set out the procedures, practices, resources, sequence of key safety-related activities and monitoring measures necessary to ensure the safety of the proposed work or activity and shall include

             (a)  a summary of and references to the management system that demonstrate how it will be applied to the proposed work or activity and how the duties set out in these regulations with regard to safety will be fulfilled;

             (b)  a summary of the studies undertaken to identify hazards and to evaluate safety risks related to the proposed work or activity;

             (c)  a description of the hazards that were identified and the results of the risk evaluation;

             (d)  a summary of the measures to avoid, prevent, reduce and manage safety risks;

             (e)  a list of all structures, facilities, equipment and systems critical to safety and a summary of the system in place for their inspection, testing and maintenance;

             (f)  a description of the organizational structure for the proposed work or activity and the command structure on the installation, which clearly explains

                      (i)  their relationship to each other, and

                     (ii)  the contact information and position of the person accountable for the safety plan and of the person responsible for implementing it;

             (g) where the possibility of pack sea ice or drifting icebergs exists at the drill or production site, the measures to address the protection of the installation, including systems for ice detection, surveillance, data collection, reporting, forecasting and, where appropriate, ice avoidance or deflection; and

             (h)  a description of the arrangements for monitoring compliance with the plan and for measuring performance in relation to its objectives.

120/09 s9

Back to Top

Environmental plan

      10. The environmental protection plan shall set out the procedures, practices, resources and monitoring necessary to manage hazards to and protect the environment from the proposed work or activity and shall include

             (a)  a summary of and references to the management system that demonstrate how it will be applied to the proposed work or activity and how the duties set out in these regulations with regard to environmental protection will be fulfilled;

             (b)  a summary of the studies undertaken to identify environmental hazards and to evaluate environmental risks relating to the proposed work or activity;

             (c)  a description of the hazards that were identified and the results of the risk evaluation;

             (d)  a summary of the measures to avoid, prevent, reduce and manage environmental risks;

             (e)  a list of all structures, facilities, equipment and systems critical to environmental protection and a summary of the system in place for their inspection, testing and maintenance;

             (f)  a description of the organizational structure for the proposed work or activity and the command structure on the installation, which clearly explains

                      (i)  their relationship to each other, and

                     (ii)  the contact information and position of the person accountable for the environmental protection plan and the person responsible for implementing it;

             (g)  the procedures for the selection, evaluation and use of chemical substances including process chemicals and drilling fluid ingredients;

             (h)  a description of equipment and procedures for the treatment, handling and disposal of waste material;

              (i)  a description of all discharge streams and limits for any discharge into the natural environment including any waste material;

              (j)  a description of the system for monitoring compliance with the discharge limits identified in paragraph (i), including the sampling and analytical program to determine if those discharges are within the specified limits; and

             (k)  a description of the arrangements for monitoring compliance with the plan and for measuring performance in relation to its objectives.

120/09 s10

Back to Top

Well approval

      11. (1) An operator who intends to drill, re-enter, work over, complete or recomplete a well or suspend or abandon a well or part of a well shall obtain a well approval.

             (2)  Notwithstanding subsection (1), a well approval is not necessary to conduct a wire line, slick line or coiled tubing operation through a Christmas tree located above sea level where

             (a)  the work does not alter the completion interval or is not expected to adversely affect recovery; and

             (b)  the equipment, operating procedures and qualified persons exist to conduct the wire line, slick line or coiled tubing operations as set out in the authorization.

120/09 s11

Back to Top

Well approval -drilling

      12. Where the well approval sought is to drill a well, the application shall contain

             (a)  a comprehensive description of the drilling program; and

             (b)  a well data acquisition program that allows for the collection of sufficient cutting and fluid samples, logs, conventional cores, sidewall cores, pressure measurements and formation flow tests, analyses and surveys to enable a comprehensive geological and reservoir evaluation to be made.

120/09 s12

Back to Top

Application

      13. The application shall contain

             (a)  where the well approval sought is to re-enter, work over, complete or recomplete a well or suspend or abandon a well or part of it, a detailed description of that well, the proposed work or activity and the rationale for conducting it;

             (b)  where the well approval sought is to complete a well, in addition to the information required under paragraph (a), information that demonstrates that section 47 will be complied with; and

             (c)  where the well approval sought is to suspend a well or part of it, in addition to the information required under paragraph (a), an indication of the period within which the suspended well or part of it will be abandoned or completed.

120/09 s13

Back to Top

Well approval

      14. The board shall grant the well approval where an operator demonstrates that the work or activity will be conducted safely, without waste and without pollution, in compliance with these regulations.

120/09 s14

Back to Top

Suspension and revocation of approval

      15. (1) The board may suspend the well approval where

             (a)  the operator fails to comply with the approval and the work or activity cannot be conducted safely, without waste or without pollution;

             (b)  the safety of the work or activity becomes uncertain because

                      (i)  the level of performance of the installation or service equipment, any ancillary equipment or any support craft is demonstrably less than the level of performance indicated in the application, or

                     (ii)  the physical environmental conditions encountered in the area of the activity for which the well approval was granted are more severe than the equipment's operating limits as specified by the manufacturer; or

             (c)  the operator fails to comply with the approvals issued under subsection 8 (2), 53 (4) or 67 (2).

             (2)  The board may revoke the well approval where an operator fails to remedy the situation causing the suspension within 120 days after the date of that suspension.

120/09 s15

Back to Top

Development plans

      16. For the purpose of subsection 135(1) of the Act, the well approval relating to a production project is prescribed.

120/09 s16

Back to Top

Resource management plan

      17. For the purpose of paragraph 135(3)(b) of the Act, Part II of the development plan relating to a proposed development of a pool or field shall contain a resource management plan.

120/09 s17

PART III
OPERATOR'S DUTIES

Back to Top

Availability of documents

      18. (1) An operator shall keep a copy of the authorization, the well approval and all other approvals and plans required under these regulations, the Act and the regulations made under the Act at each installation and shall make them available for examination at the request of any person at each installation.

             (2)  An operator shall ensure that a copy of all operating manuals and other procedures and documents necessary to execute the work or activity and to operate the installation safely without pollution are readily accessible at each installation.

120/09 s18

Back to Top

Management system

      19. An operator shall ensure compliance with the management system referred to in section 6 .

120/09 s19

Back to Top

Safety and environmental protection

      20. An operator shall take all reasonable precautions to ensure safety and environmental protection, including ensuring that

             (a)  any operation necessary for the safety of persons at an installation or on a support craft has priority, at all times, over any work or activity at that installation or on that support craft;

             (b)  safe work methods are followed during all drilling, well or production operations;

             (c)  there is a shift handover system to effectively communicate any conditions, mechanical or procedural deficiencies or other problems that might have an impact on safety or environmental protection;

             (d)  differences in language or other barriers to effective communication do not jeopardize safety or environmental protection;

             (e)  all persons at an installation, or in transit to or from an installation, receive instruction in and are familiar with safety and evacuation procedures and with their roles and responsibilities in the contingency plans, including emergency response procedures;

             (f)  any drilling or well operation is conducted in a manner that maintains full control of the well at all times;

             (g)  where there is loss of control of a well at an installation, all other wells at that installation are shut in until the well that is out of control is secured;

             (h)  plans are in place to deal with potential hazards;

              (i)  all equipment required for safety and environmental protection is available and in an operable condition;

              (j)  the inventory of all equipment identified in the safety plan and the environmental protection plan is updated after the completion of any significant modification or repair to any major component of the equipment;

             (k)  the administrative and logistical support that is provided for drilling, well or production operations includes accommodation, transportation, first aid and storage, repair facilities and communication systems suitable for the area of operations;

              (l)  a sufficient number of trained and competent individuals are available to complete the authorized work or activities and to carry out any work or activity safely and without pollution; and

           (m)  any operational procedure that is a hazard to safety or the environment is corrected and all affected persons are informed of the alteration.

120/09 s20

Back to Top

Appropriate use of equipment

      21. (1) A person shall not tamper with, activate without cause, or misuse any safety or environmental protection equipment.

             (2)  A passenger on a helicopter, supply vessel or any other support craft engaged in a drilling program or production project shall comply with all applicable safety instructions.

120/09 s21

Back to Top

Smoking prohibited

      22. (1) A person shall not smoke on an installation except in those areas set aside by the operator for that use.

             (2)  An operator shall ensure compliance with subsection (1).

120/09 s22

Back to Top

Storing and handling of consumables

      23. An operator shall ensure that fuel, potable water, spill containment products, safety-related chemicals, drilling fluids, cement and other consumables are

             (a)  readily available and stored on an installation in quantities sufficient for any normal and reasonably foreseeable emergency condition; and

             (b)  stored and handled in a manner that minimizes their deterioration, ensures safety and prevents pollution.

120/09 s23

Back to Top

Handling of chemical substances, waste material and oil

      24. An operator shall ensure that all chemical substances, including process fluids and diesel fuel, waste material, drilling fluid and drill cuttings generated at an installation, are handled in a way that does not create a hazard to safety or the environment.

120/09 s24

Back to Top

Cessation of a work or activity

      25. (1) An operator shall ensure that any work or activity ceases without delay where that work or activity

             (a)  endangers or is likely to endanger the safety of persons;

             (b)  endangers or is likely to endanger the safety or integrity of the well or the installation; or

             (c)  causes or is likely to cause pollution.

             (2)  Where the work or activity ceases, the operator shall ensure that it does not resume until it can do so safely and without pollution.

120/09 s25

PART IV
EQUIPMENT AND OPERATIONS

Back to Top

Duties of operator

      26. An operator shall ensure that

             (a)  all wells, installations, equipment and facilities are designed, constructed, tested, maintained and operated to prevent incidents and waste under the maximum load conditions that may be reasonably anticipated during any operation;

             (b)  a comprehensive inspection that includes a non-destructive examination of critical joints and structural members of an installation and any critical drilling or production equipment is made at an interval to ensure continued safe operation of the installation or equipment and in any case, at least once in every 5 year period; and

             (c)  records of maintenance, tests and inspections are kept.

120/09 s26

Back to Top

Duties of operator

      27. An operator shall ensure that

             (a)  the components of an installation and well tubulars, Christmas trees and wellheads are operated in accordance with good engineering practices; and

             (b)  any part of an installation that may be exposed to a sour environment is designed, constructed and maintained to operate safely in that environment.

120/09 s27

Back to Top

Defect to be remedied

      28. (1) An operator shall ensure that any defect in the installation, equipment, facilities and support craft that may be a hazard to safety or the environment is rectified without delay.

             (2)  Where it is not possible to rectify the defect without delay, an operator shall ensure that it is rectified as soon as the circumstances permit and that mitigation measures are put in place to minimize the hazards while the defect is being rectified.

120/09 s28

Back to Top

Drilling fluid system

      29. An operator shall ensure that

             (a)  the drilling fluid system and associated monitoring equipment is designed, installed, operated and maintained to provide an effective barrier against formation pressure, to allow for proper well evaluation, to ensure safe drilling operations and to prevent pollution; and

             (b)  the indicators and alarms associated with the monitoring equipment are strategically located on the drilling rig to alert onsite personnel.

120/09 s29

Back to Top

Marine riser

      30. (1) An operator shall ensure that every marine riser is capable of

             (a)  furnishing access to the well;

             (b)  isolating the well-bore from the sea;

             (c)  withstanding the differential pressure of the drilling fluid relative to the sea;

             (d)  withstanding the physical forces anticipated in the drilling program; and

             (e)  permitting the drilling fluid to be returned to the installation.

             (2)  An operator shall ensure that every marine riser is supported in a manner that effectively compensates for the forces caused by the motion of the installation.

120/09 s30

Back to Top

Drilling practices

      31. An operator shall ensure that adequate equipment, procedures and personnel are in place to recognize and control normal and abnormal pressures, to allow for safe, controlled drilling operations and to prevent pollution.

120/09 s31

Back to Top

Reference for well depths

      32. An operator shall ensure that any depth in a well is measured from a single reference point, which is either the kelly bushing or the rotary table of the drilling rig.

120/09 s32

Back to Top

Directional and deviation surveys

      33. An operator shall ensure that

             (a)  directional and deviation surveys are taken at intervals that allow the position of the well-bore to be determined accurately; and

             (b)  except in the case of a relief well, a well is drilled in a manner that does not intersect an existing well.

120/09 s33

Back to Top

Formation of leak-off tests

      34. An operator shall ensure that

             (a)  a formation leak-off test or a formation integrity test is conducted before drilling more than 10 m below the shoe of any casing other than the conductor casing;

             (b)  the formation leak-off test or the formation integrity test is conducted to a pressure that allows for safe drilling to the next planned casing depth; and

             (c)  a record is retained of each formation leak-off test and the results included in the daily drilling report referred to in paragraph 85 (a) and in the well history report referred to in section 90 .

120/09 s34

Back to Top

Formation flow and well testing equipment

      35. (1) An operator shall ensure that

             (a)  the equipment used in a formation flow test is designed to safely control well pressure, properly evaluate the formation and prevent pollution;

             (b)  the rated working pressure of formation flow test equipment upstream of and including the well testing manifold exceeds the maximum anticipated shut-in pressure; and

             (c)  the equipment downstream of the well testing manifold is sufficiently protected against overpressure.

             (2)  An operator of a well shall ensure that the formation flow test equipment includes a down-hole safety valve that permits closure of the test string above the packer.

             (3)  An operator shall ensure that any formation flow test equipment used in testing a well that is drilled with a floating drilling unit has a subsea test tree that includes

             (a)  a valve that may be operated from the surface and automatically closes when required to prevent uncontrolled well flow; and

             (b)  a release system that permits the test string to be hydraulically or mechanically disconnected within or below the blow-out preventers.

120/09 s35

Back to Top

Well control

      36. An operator shall ensure that adequate procedures, materials and equipment are in place and utilized to minimize the risk of loss of well control in the event of lost circulation.

120/09 s36

Back to Top

Well control equipment

      37. (1) An operator shall ensure that, during all well operations, reliably operating well control equipment is installed to control kicks, prevent blow-outs and safely carry out all well activities and operations, including drilling, completion and workover operations.

             (2)  After setting the surface casing, the operator shall ensure that at least 2 independent and tested well barriers are in place during all well operations.

             (3)  Where a barrier fails, the operator shall ensure that no other activities, other than those intended to restore or replace the barrier, take place in the well.

             (4)  An operator shall ensure that, during drilling, except when drilling under-balanced, one of the 2 barriers to be maintained is the drilling fluid column.

120/09 s37

Back to Top

Equipment to be tested

      38. An operator shall ensure that pressure control equipment associated with drilling, coil tubing, slick line and wire line operations is pressure-tested on installation and as often as necessary to ensure its continued safe operation.

120/09 s38

Back to Top

Loss of well control

      39. Where the well control is lost or where safety, environmental protection or resource conservation is at risk, the operator shall ensure that any action necessary to rectify the situation is taken without delay, despite any condition to the contrary in the well approval.

120/09 s39

Back to Top

Casing and cementing

      40. An operator shall ensure that the well and casing are designed so that

             (a)  the well can be drilled safely, the targeted formations evaluated and waste prevented;

             (b)  the anticipated conditions, forces and stresses that may be placed upon them are withstood; and

             (c)  the integrity of gas hydrate zones is protected.

120/09 s40

Back to Top

Depth of installation

      41. An operator shall ensure that the well and casing are installed at a depth that provides for adequate kick tolerances and well control operations that provide for safe, constant bottom hole pressure.

120/09 s41

Back to Top

Cement slurry requirements

      42. An operator shall ensure that cement slurry is designed and installed so that

             (a)  the movement of formation fluids in the casing annuli is prevented and, where required for safety, resource evaluation or prevention of waste, the isolation of the petroleum and water zones is ensured;

             (b)  support for the casing is provided;

             (c)  corrosion of the casing over the cemented interval is retarded; and

             (d)  the integrity of gas hydrate zones is protected.

120/09 s42

Back to Top

Waiting on cement time

      43. After the cementing of any casing or casing liner and before drilling out the casing shoe, the operator shall ensure that the cement has reached the minimum compressive strength sufficient to support the casing and provide zonal isolation.

120/09 s43

Back to Top

Casing pressure testing

      44. After installing and cementing the casing and before drilling out the casing shoe, the operator shall ensure that the casing is pressure-tested to the value required to confirm its integrity for maximum anticipated operating pressure.

120/09 s44

Back to Top

Production tubing

      45. An operator shall ensure that the production tubing used in a well is designed to withstand the maximum conditions, forces and stresses that may be placed on it and to maximize recovery from the pool.

120/09 s45

Back to Top

Monitoring and control of process operations

      46. An operator shall ensure that

             (a)  operations such as processing, transportation, storage, re-injection and handling of petroleum on the installation are effectively monitored to prevent incidents and waste;

             (b)  all alarm, safety, monitoring, warning and control systems associated with those operations are managed to prevent incidents and waste; and

             (c)  all appropriate persons are informed of the applicable alarm, safety, monitoring, warning or control systems associated with those operations that are taken out of service, and when those systems are returned to service.

120/09 s46

Back to Top

Well completion

      47. (1) An operator that completes a well shall ensure that

             (a)  it is completed in a safe manner and allows for maximum recovery;

             (b)  except in the case of commingled production, each completion interval is isolated from any other porous or permeable interval penetrated by the well;

             (c)  the testing and production of any completion interval are conducted safely and do not cause waste or pollution;

             (d)  where applicable, sand production is controlled and does not create a safety hazard or cause waste;

             (e)  each packer is set as close as practical to the top of the completion interval and that the pressure testing of the packer to a differential pressure is greater than the maximum differential pressure anticipated under the production or injection conditions;

             (f)  where practical, any mechanical well condition that may have an adverse effect on production of petroleum from, or the injection of fluids into, the well is corrected;

             (g)  the injection or production profile of the well is improved, or the completion interval of the well is changed, where it is necessary to do so to prevent waste;

             (h)  where different pressure and inflow characteristics of 2 or more pools might adversely affect the recovery from any of those pools, the well is operated as a single pool well or as a segregated multi-pool well;

              (i)  after initial completion, all barriers are tested to the maximum pressure to which they are likely to be subjected; and

              (j)  following any workover, any affected barriers are pressure-tested.

             (2)  An operator of a segregated multi-pool well shall ensure that

             (a)  after the well is completed, segregation has been established within and outside the well casing and is confirmed; and

             (b)  where there is reason to doubt that segregation is being maintained, a segregation test is conducted within a reasonable time frame.

120/09 s47

Back to Top

Subsurface safety valve

      48. An operator of a development well capable of flow shall ensure that the well is equipped with a fail-safe subsurface safety valve that is designed, installed, operated and tested to prevent uncontrolled well flow when it is activated.

120/09 s48

Back to Top

Wellhead and Christmas tree equipment

      49. An operator shall ensure that the wellhead and Christmas tree equipment, including valves, are designed to operate safely and efficiently under the maximum load conditions anticipated during the life of the well.

120/09 s49

PART V
EVALUATION OF WELLS, POOLS AND FIELDS

Back to Top

Implementation-acquisition programs

      50. An operator shall ensure that the well data acquisition program and the field data acquisition program are implemented in accordance with good oilfield practices.

120/09 s50

Back to Top

Where programs cannot be implemented

      51. (1) Where part of the well or field data acquisition program cannot be implemented, the operator shall ensure that

                   (a) a conservation officer is notified as soon as the circumstances permit; and

                   (b) the procedures to otherwise achieve the goals of the program are submitted to the board for approval.

             (2)  Where the operator can demonstrate that those procedures can achieve the goals of the well or field data acquisition program or are all that can be reasonably expected in the circumstances, the board shall approve them.

120/09 s51

Back to Top

Testing and sampling of formations

      52. An operator shall ensure that every formation in a well is tested and sampled to obtain reservoir pressure data and fluid samples from the formation, where there is an indication that the data or samples would contribute substantially to the geological and reservoir evaluation.

120/09 s52

Back to Top

Formation flow testing

      53. (1) An operator shall ensure that

             (a)  a development well is not put into production unless the board has approved a formation flow test with respect to the development well; and

             (b)  where a development well is subjected to a well operation that might change its deliverability, productivity or injectivity, a formation flow test is conducted within a reasonable time frame after the well operation is ended to determine the effects of that operation on the well's deliverability, productivity or injectivity.

             (2)  An operator may conduct a formation flow test on a well drilled on a geological feature where, before conducting that test, the operator

             (a)  submits to the board a detailed testing program; and

             (b)  obtains the board's approval to conduct the test.

             (3)  The board may require that an operator conduct a formation flow test on a well drilled on a geological feature, other than the first well, where there is an indication that the test would contribute substantially to the geological and reservoir evaluation.

             (4)  The board shall approve a formation flow test where the operator demonstrates that the test will be conducted safely, without pollution and in accordance with good oilfield practices and that the test will enable the operator to

             (a)  obtain data on the deliverability or productivity of the well;

             (b)  establish the characteristics of the reservoir; and

             (c)  obtain representative samples of the formation fluids.

120/09 s53

Back to Top

Submission of samples and data

      54. An operator shall ensure that all cutting samples, fluid samples and cores collected as part of the well and field data acquisition programs are

             (a)  transported and stored in a manner that prevents any loss or deterioration;

             (b)  delivered to the board within 60 days after the rig release date unless analyses are ongoing, in which case those samples and cores, or the remaining parts, are to be delivered on completion of the analyses; and

             (c)  stored in durable containers properly labelled for identification.

120/09 s54

Back to Top

Samples removed from core

      55. An operator shall ensure that after any samples necessary for analysis or for research or academic studies have been removed from a conventional core, the remaining core, or a longitudinal slab that is not less than one half of the cross-sectional area of that core, is submitted to the board.

120/09 s55

Back to Top

Notification required

      56. Before disposing of cutting samples, fluid samples, cores or evaluation data under these regulations, the operator shall ensure that the board is notified in writing and is given an opportunity to request delivery of the samples, cores or data.

120/09 s56

PART VI
WELL TERMINATION

Back to Top

Suspension or abandonment

      57. An operator shall ensure that every well that is suspended or abandoned can be readily located and left in a condition that

             (a)  provides for isolation of all hydrocarbon bearing zones and discrete pressure zones; and

             (b)  prevents any formation fluid from flowing through or escaping from the well-bore.

120/09 s57

Back to Top

Monitoring and inspection

      58. An operator of a suspended well shall ensure that the well is monitored and inspected to maintain its continued integrity and to prevent pollution.

120/09 s58

Back to Top

Seafloor to be cleared

      59. An operator shall ensure that, on the abandonment of a well, the seafloor is cleared of any material or equipment that might interfere with other commercial uses of the sea.

120/09 s59

Back to Top

Installation removal

      60. An operator shall not remove or cause to have removed a drilling installation from a well drilled under these regulations unless the well has been terminated in accordance with these regulations.

120/09 s60

PART VII
MEASUREMENTS

Back to Top

Flow and volume

      61. (1) Unless otherwise included in the approval issued under subsection 8 (2), the operator shall ensure that the rate of flow and the volume of the following are measured and recorded:

             (a)  the fluid that is produced from each well;

             (b)  the fluid that is injected into each well;

             (c)  any produced fluid that enters, leaves, is used or is flared, vented, burned or otherwise disposed of on an installation, including any battery room, treatment facility or processing plant; and

             (d)  any air or materials injected for the purposes of disposal, storage or cycling, including drill cuttings and other useless material that is generated during drilling, well or production operations.

             (2)  An operator shall ensure that any measurements are conducted in accordance with the flow system, flow calculation procedure and flow allocation procedure, approved under subsection 8 (2).

120/09 s61

Back to Top

Allocation

      62. (1) An operator shall ensure that group production of petroleum from wells and injection of a fluid into wells is allocated on a pro rata basis, in accordance with the flow system, flow calculation procedure and flow allocation procedure approved under subsection 8 (2).

             (2)  Where a well is completed over multiple pools or zones, the operator shall ensure that production or injection volumes for the well are allocated on a pro rata basis to the pools or zones in accordance with the flow allocation procedure approved under subsection 8 (2).

120/09 s62

Back to Top

Testing, maintenance and notification

      63. An operator shall ensure

             (a)  that meters and associated equipment are calibrated and maintained to ensure their continued accuracy;

             (b)  that equipment used to calibrate the flow system is calibrated in accordance with good measurement practices;

             (c)  that any component of the flow system that may have an impact on the accuracy or integrity of the flow system and that is not functioning in accordance with the manufacturer's specifications is repaired or replaced without delay, or, where it is not possible to do so without delay, corrective measures are taken to minimize the impact on the accuracy and integrity of the flow system while the repair or replacement is proceeding; and

             (d)  that a conservation officer is notified, as soon as the circumstances permit, of any malfunction or failure of any flow system component that may have an impact on the accuracy of the flow system and of the corrective measures taken.

120/09 s63

Back to Top

Transfer meters

      64. An operator shall ensure that

             (a)  a conservation officer is notified at least 14 days before the day on which any transfer meter prover or master meter used in conjunction with a transfer meter is calibrated; and

             (b)  a copy of the calibration certificate is submitted to the Chief Conservation Officer as soon as the circumstances permit, following completion of the calibration.

120/09 s64

Back to Top

Proration of testing frequency

      65. An operator of a development well that is producing petroleum shall ensure that sufficient proration tests are performed to permit reasonably accurate determination of the allocation of oil, gas and water production on a pool and zone basis.

120/09 s65

PART VIII
PRODUCTION CONSERVATION

Back to Top

Resource management

      66. An operator shall ensure that

             (a)  maximum recovery from a pool or zone is achieved in accordance with good oilfield practices;

             (b)  wells are located and operated to provide for maximum recovery from a pool; and

             (c)  where there is reason to believe that infill drilling or implementation of an enhanced recovery scheme might result in increased recovery from a pool or field, studies on these methods are carried out and submitted to the board.

120/09 s66

Back to Top

Commingled production

      67. (1) An operator shall not engage in commingled production except in accordance with the approval granted under subsection (2).

             (2)  The board shall approve the commingled production where the operator demonstrates that it would not reduce the recovery from the pools or zones.

             (3)  An operator engaging in commingled production shall ensure that the total volume and the rate of production of each fluid produced is measured and the volume from each pool or zone is allocated in accordance with the requirements of Part VII.

120/09 s67

Back to Top

Gas flaring and venting

      68. An operator shall not flare or vent gas unless

             (a)  it is otherwise permitted in the approval issued under subsection 53 (4) or in the authorization; or

             (b)  it is necessary to do so because of an emergency situation and the board is notified in the daily drilling report, daily production report or in any other written or electronic form, as soon as the circumstances permit, of the flaring or venting and of the amount flared or vented.

120/09 s68

Back to Top

Oil burning

      69. An operator shall not burn oil unless

             (a)  it is otherwise permitted in the approval issued under subsection 53 (4) or in the authorization; or

             (b)  it is necessary to do so because of an emergency situation and the board is notified in the daily drilling report, daily production report or in any other written or electronic form, as soon as the circumstances permit, of the burning and the amount burned.

120/09 s69

PART IX
SUPPORT OPERATIONS

Back to Top

Support craft

      70. An operator shall ensure that all support craft are designed, constructed and maintained to supply the necessary support functions and operate safely in the foreseeable physical environmental conditions prevailing in the area in which they operate.

120/09 s70

Back to Top

Support craft- manned installations

      71. (1) An operator of a manned installation shall ensure that at least one support craft is

             (a)  available at a distance that is not greater than that required for a return time of 20 minutes; and

             (b)  suitably equipped to supply the necessary emergency services including rescue and first aid treatment for all personnel on the installation in the event of an emergency.

             (2)  Where the support craft exceeds the distance referred to in paragraph (1)(a), both the installation manager and the person in charge of the support craft shall log this fact and the reason why the distance or time was exceeded.

             (3)  Under the direction of the installation manager, the support craft crew shall keep the craft in close proximity to the installation, maintain open communication channels with the installation and be prepared to conduct rescue operations during any activity or condition that presents an increased level of risk to the safety of personnel or the installation.

120/09 s71

Back to Top

Safety zone

      72. (1) For the purposes of this section, the safety zone around an installation consists of the area within a line enclosing and drawn at a distance of 500 metres from the outer edge of the installation.

             (2)  A support craft shall not enter the safety zone without the consent of the installation manager.

             (3)  An operator shall take all reasonable measures to warn persons who are in charge of vessels and aircraft of the safety zone boundaries, of the facilities within the safety zone and of any related potential hazards.

120/09 s72

PART X
TRAINING AND COMPETENCY

Back to Top

Training and competency of personnel

      73. An operator shall ensure that

             (a)  all personnel have, before assuming their duties, the necessary experience, training and qualifications and are able to conduct their duties safely, competently and in compliance with these regulations; and

             (b)  records of the experience, training and qualifications of all personnel are kept and made available to the board upon request.

120/09 s73

Back to Top

Impairment and fatigue

      74. (1) An operator shall ensure that a person does not work when his or her ability to function is impaired and that a person is not required to work

             (a)  any shift in excess of 12.5 continuous hours; or

             (b)  2 successive shifts of any duration unless that person has had at least 8 hours' rest between the shifts.

             (2)  Notwithstanding subsection (1), an operator may allow a person to work in excess of the hours or without the rest period referred to in that subsection where the operator has assessed the risk associated with the person working the extra hours and determined that the work can be carried out without increased risk to safety or to the environment.

             (3)  Where an operator allows a person to work in excess of the hours or without the rest period referred to in subsection (1), the operator shall ensure that a description of the work, the names of the persons performing the work, the hours worked and the risk assessment referred to in subsection (2) are recorded.

120/09 s74

PART XI
SUBMISSIONS, NOTIFICATIONS, RECORDS AND REPORTS

Back to Top

Reference to names and designations

      75. When submitting any information for the purposes of these regulations, an operator shall refer to each well, pool and field by the name given to it under sections 4 and 5 , or if a zone, by its designation by the board under section 5 .

120/09 s75

Back to Top

Surveys

      76. (1) An operator shall ensure that a survey is used to confirm the location of the well on the seafloor.

             (2)  The survey shall be certified by a person licensed under the Canada Lands Surveyors Act.

             (3)  An operator shall ensure that a copy of the survey plan filed with the Canada Lands Surveys Records is submitted to the board.

120/09 s76

Back to Top

Incidents and near-misses

      77. (1) An operator shall ensure that

             (a)  the board is notified of any incident or near-miss as soon as the circumstances permit; and

             (b)  the board is notified at least 24 hours in advance of any press release or press conference held by the operator concerning any incident or near-miss during any activity to which these regulations apply, except in an emergency situation, in which case it shall be notified without delay before the press release or press conference.

             (2)  An operator shall ensure that

             (a)  any incident or near-miss is investigated, its root cause and causal factors identified and corrective action taken; and

             (b)  for any of the following incidents or near-misses, a copy of an investigation report identifying the root cause, causal factors and corrective action taken is submitted to the board no later than 21 days after the day on which the incident or near-miss occurred:

                      (i)  a lost or restricted workday injury,

                     (ii)  death,

                    (iii)  fire or explosion,

                    (iv)  a loss of containment of any fluid from a well,

                     (v)  an imminent threat to the safety of a person, installation or support craft, or

                    (vi)  a significant pollution event.

120/09 s77

Back to Top

Submission of data and analysis

      78. (1) An operator shall ensure that a final copy of the results, data, analyses and schematics obtained from the following sources is submitted to the board:

             (a)  testing, sampling and pressure surveys carried out as part of the well and field data acquisition programs referred to in section 50 and testing and sampling of formations referred to in section 52 ; and

             (b)  any segregation test or well operation.

             (2)  Unless otherwise indicated in these regulations, An operator shall ensure that the results, data, analyses and schematics are submitted within 60 days after the day on which any activity referred to in paragraphs (1)(a) and (b) is completed.

120/09 s78

Back to Top

Records

      79. An operator shall ensure that records are kept of

             (a)  all persons arriving, leaving or present on the installation;

             (b)  the location and movement of support craft, the emergency drills and exercises, incidents, near-misses, the quantities of consumable substances that are required to ensure the safety of operations and other observations and information critical to the safety of persons on the installation or the protection of the environment;

             (c)  daily maintenance and operating activities, including any activity that may be critical to the safety of persons on the installation, the protection of the environment or the prevention of waste;

             (d)  in the case of a production installation,

                      (i)  the inspection of the installation and related equipment for corrosion and erosion and any resulting maintenance carried out,

                     (ii)  the pressure, temperature and flow rate data for compressors and treating and processing facilities,

                    (iii)  the calibration of meters and instruments,

                    (iv)  the testing of surface and subsurface safety valves,

                     (v)  the status of each well and the status of well operations, and

                    (vi)  the status of the equipment and systems critical to safety and protection of the environment including any unsuccessful test result or equipment failure leading to an impairment of the systems; and

             (e)  in the case of a floating installation, all installation movements, data, observations, measurements and calculations related to the stability and station-keeping capability of the installation.

120/09 s79

Back to Top

Meteorological observations

      80. An operator of an installation shall ensure

             (a)  that the installation is equipped with facilities and equipment for observing, measuring and recording physical environmental conditions and that a comprehensive record of observations of physical environmental conditions is maintained onboard the installation; and

             (b)  that forecasts of meteorological conditions, sea states and ice movements are obtained and recorded each day and each time during the day that they change substantially from those forecasted.

120/09 s80

Back to Top

Daily production record

      81. An operator shall ensure that a daily production record, which includes the metering records and other information relating to the production of petroleum and other fluids with respect to a pool or well, is retained and readily accessible to the board until the field or well in which the pool is located is abandoned and at that time shall offer the record to the board before destroying it.

120/09 s81

Back to Top

Management of records

      82. An operator shall ensure that

             (a)  all processes are in place and implemented to identify, generate, control and retain records necessary to support operational and regulatory requirements; and

             (b)  the records are readily accessible for inspection by the board.

120/09 s82

Back to Top

Formation of flow test reports

      83. An operator shall ensure that

             (a)  with respect to exploration and delineation wells, a daily record of formation flow test results is submitted to the board; and

             (b)  with respect to all wells, a formation flow test report is submitted to the board as soon as the circumstances permit, following completion of the test.

120/09 s83

Back to Top

Pilot scheme

      84. (1) For the purposes of this section, "pilot scheme" means a scheme that applies existing or experimental technology over a limited portion of a pool to obtain information on reservoir or production performance for the purpose of optimizing field development or improving reservoir or production performance.

             (2)  An operator shall ensure that interim evaluations of any pilot scheme respecting a pool, field or zone are submitted to the board.

             (3)  When an operator completes a pilot scheme, the operator shall ensure that a report is submitted to the board that sets out

             (a)  the results of the scheme and supporting data and analyses; and

             (b)  the operator's conclusions as to the potential of the scheme for application to full-scale production.

120/09 s84

Back to Top

Daily reports

      85. An operator shall ensure that a copy of the following is submitted to the board daily:

             (a)  the daily drilling report;

             (b)  the daily geological report, including any formation evaluation logs and data; and

             (c)  in the case of a production installation, a summary, in the form of a daily production report, of the records referred to in paragraph 79 (d) and the daily production record.

120/09 s85

Back to Top

Monthly production report

      86. (1) An operator shall ensure that a report summarizing the production data collected during the preceding month is submitted to the board not later than the 15th day of each month.

             (2)  The report shall use established production accounting procedures.

120/09 s86

Back to Top

Annual production report

      87. An operator shall ensure that, not later than March 31 of each year, an annual production report for a pool, field or zone is submitted to the board providing information that demonstrates how the operator manages and intends to manage the resource without causing waste, including:

             (a)  for the preceding year, details on the performance, production forecast, reserve revision, reasons for significant deviations in well performance from predictions in previous annual production reports, gas conservation resources, efforts to maximize recovery and reduce costs and the operating and capital expenditures, including the cost of each well operation; and

             (b)  for the current year and the next 2 years, estimates of the operating and capital expenditures, including the cost of each well operation.

120/09 s87

Back to Top

Environmental reports

      88. (1) For each production project, an operator shall ensure that, not later than March 31 of each year, an annual environmental report relating to the preceding year is submitted to the board and includes

             (a)  for each installation, a summary of the general environmental conditions during the year and a description of ice management activities; and

             (b)  a summary of environmental protection matters during the year, including a summary of any incidents that may have an environmental impact, discharges that occurred and waste material that was produced, a discussion of efforts undertaken to reduce pollution and waste material and a description of environmental contingency plan exercises.

             (2)  For each drilling installation for an exploration or delineation well, the operator shall ensure that an environmental report relating to each well is submitted to the board within 90 days after the rig release date and includes

             (a)  a description of the general environmental conditions during the drilling program and a description of ice management activities and downtime caused by weather or ice; and

             (b)  a summary of environmental protection matters during the drilling program, including a summary of spills, discharges occurred and waste material produced, a discussion of efforts undertaken to reduce them, and a description of environmental contingency plan exercises.

120/09 s88

Back to Top

Annual safety report

      89. An operator shall ensure that, not later than March 31 of each year, an annual safety report relating to the preceding year is submitted to the board and includes

             (a)  a summary of lost or restricted workday injuries, minor injuries and safety-related incidents and near-misses that have occurred during the preceding year; and

             (b)  a discussion of efforts undertaken to improve safety.

120/09 s89

Back to Top

Well history report

      90. (1) An operator shall ensure that a well history report is prepared for every well drilled by the operator under the well approval and that the report is submitted to the board.

             (2)  The well history report shall contain a record of all operational, engineering, petrophysical and geological information that is relevant to the drilling and evaluation of the well.

120/09 s90

Back to Top

Well operations report

      91. (1) An operator shall ensure that a report including the following information is submitted to the board within 30 days after the end of a well operation:

             (a)  a summary of the well operation, including any problems encountered during the well operation;

             (b)  a description of the completion fluid properties;

             (c)  a schematic of, and relevant engineering data on, the down-hole equipment, tubulars, Christmas tree and production control system;

             (d)  details of any impact of the well operation on the performance of the well, including any effect on recovery; and

             (e)  for any well completion, suspension or abandonment, the rig release date.

             (2)  The report shall be signed and dated by the operator or the operator's representative.

120/09 s91

Back to Top

Other reports

      92. An operator shall ensure that the board is made aware, at least once a year, of any report containing relevant information regarding applied research work or studies obtained or compiled by the operator relating to the operator's work or activities and that a copy of it is submitted to the board on request.

120/09 s92

PART XII
TRANSITIONAL, REPEAL AND COMMENCEMENT

Back to Top

Transitional

      93. An operator at the time of the coming into force of these regulations shall comply with the requirements of section 6.

120/09 s93

Back to Top

Repeal

      94. The following regulations are repealed:

             (a)  the Offshore Petroleum Drilling Newfoundland and Labrador Regulations, Consolidated Newfoundland and Labrador Regulation 748/96; and

             (b)  the Offshore Area Petroleum Production and Conservation Newfoundland and Labrador Regulations, Newfoundland and Labrador Regulation 17/97.

120/09 s94

Back to Top

Commencement

      95. These regulations come into force on December 31, 2009 .