NEWFOUNDLAND
AND LABRADOR
REGULATION 92/00
Labrador
Hydro Project Exemption Order
under the
Electrical Power Control Act, 1994
and the
Public Utilities Act
(O.C. 2000-206 &
O.C. 2000-207)
(Filed December 14, 2000)
Under the authority of section 5.2 of the Electrical Power Control Act, 1994
and section 4.1 of the Public Utilities Act
, the Lieutenant Governor in Council makes the following Order.
Dated at St. John's
, November 30, 2000.
Gary Norris
Clerk of the Executive Council
ORDER
Analysis
Short title
1.
This Order may be cited as the Labrador
Hydro Project Exemption Order.
92/00 s1
Back to Top
Definition
2.
In this Order, the "Labrador Hydro Project" means the planning for, including discussions with potential purchasers or partners, the environmental, economic and engineering study of and, where approved, the design and construction of some or all of
(a)
generation and related facilities at Churchill Falls, Labrador
;
(b)
generation and related facilities at Gull
Island
, Labrador
;
(c)
generation and related facilities at Muskrat
Falls
, Labrador
;
(d)
dams, dykes or other works required for the generation of power at the sites referred to in paragraphs (a), (b) and (c);
(e)
the transmission facilities necessary to deliver power generated at the sites referred to in paragraphs (a), (b) and (c) to the island portion of the province and the border of the Province of Quebec and Labrador; and
(f)
other facilities related to the activities referred to in paragraphs (a) to (e).
92/00 s2
Back to Top
Exemption
3.
Newfoundland
and Labrador Hydro is exempt from the Electrical Power Control Act, 1994
and the Public Utilities Act
for all aspects of its activities pertaining to the Labrador Hydro Project as defined in section 2.
92/00 s3
©Queen's Printer